Results

What happened when someone finally checked.

Real engagements from the specialists TFI works with. Every number on this page comes from the specialist's own case study. Client names stay private unless the client agreed to be named.

Jump to: Shipping results · Technology results

Before is what the client paid per year going in.

Saved is the yearly reduction in that spend, before the specialist's fee.

Fees for shipping come out of the savings. No savings, no fee. Technology sourcing is paid by suppliers.

Your numbers depend on your contracts, volume and setup. These are examples, not a quote.

Shipping · with ShipSigma

Four companies. About $11.5M a year back.

Combined annual savings across four engagements. Three are reported results; the sporting goods figure is ShipSigma's estimate.

ShipSigma is the parcel contract specialist TFI works with. Most of these clients kept the same carrier and saw no change to how they ship.

17% to 34%

Reduction in yearly shipping spend

Under 4 hrs

Client team time, in the two cases that tracked it

4 of 4

Kept their service levels

Vinoshipper · Food and beverage

$2.1M a year

34% less on parcel shipping

Before
$6.1M a year in parcel spend
After
$4.0M a year
The problem
Online sales took off and shipping costs ballooned. Invoices were too complicated to check line by line.
What changed
Full invoice analysis, then their own three-year UPS agreement.
Their time
Less than 4 hours over 9 weeks
Disruption
None. Same carrier.
Request the full case study

Healthcare company · Confidential

$4.55M a year

On about $25M a year in parcel spend

Before
About $25M a year, mostly on group purchasing pricing after a merger
The problem
Two companies, two sets of carrier contracts, and generic pricing that didn't fit either one.
What changed
Direct carrier pricing built around their volume, zones and service needs. Their existing agreement was re-engineered, with a two-carrier setup for time-critical pharmaceutical deliveries.
Disruption
Service levels for patient-critical shipments protected.
Request the full case study

Sporting goods manufacturer · Confidential

$1.4M a year

17.1% less, estimated

Before
$8.21M a year net parcel spend
After
$6.82M a year
The problem
A 6-month RFP went nowhere. They had no way to tell if their UPS pricing was fair.
What changed
A deep dive into raw invoice data and a business case for a tailored negotiation. Competing FedEx offers pushed UPS to better discounts.
Disruption
None. Stayed with UPS.
Request the full case study

Consumer tech hardware · About $400M revenue

$3.45M a year

Hard savings on $15.7M a year in parcel and freight spend

Before
$15.7M a year across USPS, FedEx, UPS and LTL freight
The problem
A generational handoff took the shipping know-how with it. Nobody could see what shipping really cost.
What changed
A full spend analysis and a new three-year parcel contract with the best-fit carrier, plus LTL savings through a freight partner.
Their time
Less than 4 hours over 6 weeks, versus 6+ months to prepare internally
Disruption
Same service levels.
Request the full case study

Source: ShipSigma case studies. Vinoshipper is named with ShipSigma's permission; other clients are confidential. Full case studies available on request. Run your shipping numbers

Technology · with our technology sourcing partner

Faster, safer, and cheaper to run.

Our technology sourcing partner is paid by suppliers, not by you. Client names are withheld.

Engineering and design firm · North America

$140k a year

In annualized savings on server infrastructure

The problem
On-site servers couldn't keep up with CAD and rendering work, and design cycles were backing up.
What changed
Moved to on-demand cloud servers with usage monitoring, cost controls and tighter security.
Also
New servers go live in hours instead of months. They grew without buying hardware.
Request the full case study

Research organization · Federally funded

90% lower cooling costs

And 20% lower overall energy costs

The problem
Air cooling maxed out at 2.5 kW per cabinet. More computing meant building a new facility.
What changed
Cabinet-level cooling replaced the old air system.
Also
10x the computing in the same space, with floor space freed up. No new building.
Request the full case study

Produce grower · 400 users, US and Mexico

400+ users protected

Without adding IT staff

The problem
They moved to Microsoft 365 without the security or support to match. Backups were a blind spot and troubleshooting dragged.
What changed
Security gap assessment, managed endpoint protection, managed Microsoft 365 and a phased IT plan that fit the budget.
Also
Less strain on the internal team and faster fixes.
Request the full case study

Paying for tech nobody has looked at in years?

Phone, internet, IT support, cloud and software. We'll compare suppliers and pricing at no cost to you.

Source: our technology sourcing partner's case studies. Results depend on your current setup and contracts.

Next step

How much of last year's money is still out there?

Most of these companies weren't doing anything wrong. Nobody had gone back and checked. That's the job.